Monday, February 28, 2011

Hiv Initial Symotom Pins Needles

Eyes manned

The city lay in our eyes had

each of us find we do not repeat
we were staying it haunted us

sleep at his door remained
and its lights were shining
that others were often
for a passion or a fever

we sheltered under our eyelids moved

boastful and happy and frankly we flattered ourselves that we live
Treats

and when we resume the Road
transistor exhausted but full of strength out there is precisely

she was fulfilling her rent.

Saturday, February 19, 2011

Ideas To Write In Wedding Guest Book

Laces


He impressed at the wheel
the slow movements of a man weary



rode the arm for a turn


right
drew a sigh and muttered


between his teeth
"
tomorrow I will not
CREVE BORDEL
(and then softly)
except Josée
which said nothing. "

And he sniffed in his elbow

rubbing his nose in the fold

while the moon
low and heavy fire

fucked a tree trunk.

Thursday, February 17, 2011

What To Write For New Baby

VIRY: Proceedings of the 4th meeting of inhabitants

Monday night, the inhabitants of participatory project in Haute-Savoie HABITAT and CODH adopted the statutes of the association people in charge of finalizing the project, through its collective choices, and to organize the future management common areas. The second point THE AGENDA was to determine the location of the kitchen in the common room.

architect Philippe Deletraz, presented three variants of interior:

ALTERNATIVE 1: location of the kitchen in the room called a "clean" may be intended to meet ( children, dinner, projection video ,...)

ALTERNATIVE 2: location of the kitchen in room 2 so-called "dirty" can be for the various craft workshops and

ALTERNATIVE 3: localization of the kitchen in the corridor, in traffic between Hall 1 and 2.

After a first vote that allowed the exclusion of alternative 2, the exchanges around the final choice were finally allowed to vote on a VARIANT 4, not provided by the architect, locating the kitchen in the laundry area.

It is this last alternative was chosen (9 voting for Alternative 4 to 7 votes for option 1 to 1 abstention), assuming that the laundry area of the building group A and B (C who have a laundry room) is not necessarily much use , because of lifestyle on France rather turned to individual use of washing machines and tumble dryers, unlike the collective habits found in Geneva.

Finally, a synthesis of findings of working groups on floor coverings for apartment building B and C has been presented to validate the final choice ( 3rd item on the agenda ). The following coatings were used:

BUILDING B:
parquet wood glued in dry rooms (living room, hallway, lobby)
stoneware tile for wet rooms (bathroom, kitchen (before items), WC)
BUILDING C:
parquet wood glued in the living room and bedroom 1
resin concrete topping in the spare bedroom, hall, dégégament, cellars
stoneware tile for wet rooms

To conclude this meeting, the architect presented the alternatives relating to housing interior of the building B and C. Residents should meet by the next meeting where the choice will be stopped. As for other choices, they will be collected and will be done by building.