Monday, July 20, 2009

Protect Natuzzi Leather

The industrial zone of the city Planning

No network without steam loco at a discount, maybe I'll try to make it a little more, the network itself is small and the SOC seems rather high. For the sand plant, the plant, the switching station, the water tower, I used the products ARTITEC. I had problems initially with the cutting of windows that is very difficult if we want to respect the little wood. I finally resigned to sand the back wall plates until disappearance of the thickness of resin, which obscures the windows saying. This is the safest but also the longest.
Now I have to (re) ballast around the track and create credible soil around buildings.

Friday, July 17, 2009

Broken Outside Temp Gauge Mondeo



Well, we'll build a little low this city. A station in the middle of the field it is not serious. I propose to draw a main axis parallel to the road with a pub opposite the station, a little industrial activity, housing workers ... For example like that Nothing is final. Only pedestals are glued to the repositionable adhesive spray.


The relief intended to mask the trench is created, and suddenly here is this idea that tickled me to the uptown


A tram, certe of German origin, but once painted in green boxes under the windows that look quite what we saw in Picardy at a certain period, especially since it seems to me that we had been surrendered under some war damage.

This tram will run the entire length of the bottom of the network, powered by a round-trip auto-start and soft stop, he will disappear into the background to left and then reappear a few tens of seconds later to stop coming against the backdrop of the upper town.

He Can Be A Model Song

Relief

Not having thought about everything before you start, I can create negative relief on my network. Yet it would have been enough to insert a plate of extruded or expanded dense 5cm thick shelf between channels and that it changes everything. I know for the next, again I learn. By cons I can catch up a little blow by creating positive relief, and why not a city high? It provided me with more opportunity to create a passage in a tunnel on a highway and another trench on the other channel. Here's the principle. I'm not very happy with the result and I'm going to refinish it but the idea is there.


It is certainly a little "rustic" at the moment but we will refine it all. The angle covered will allow me to imagine my upper town, the track will be determined by masked terrain.

And then another idea is trying to tease me for that uptown, but we'll see later ...

Tips On Building A Shuffleboard Table

Station Coucy

I project, perhaps a bit exaggerated, to build a next network around the theme of the station Chauny (Aisne) First station because it's a holiday of my childhood, and then because of his charm. This is a building of 14 postwar architectural style that mixes neo-medieval "to modernity emerging in the interwar period. It is visible on the site: http://www.lesgares.com/
So I made a folder full of photos that station, but for a first full construction, the bar was placed a bit high. So I started by another station in the region combining the same materials, ie brick / stone / slate, but much easier to achieve, that of Coucy le Chateau. The line is now served the tracks have been taken and the plot turned into a hiking trail, but the building is being restored. This station is also shown on the same site. So this is the start of the construction site side from the dimensions of materials. It looks more like the modern prefab at the traditional but good. Assemble it all to see. Today it is still not complete, I must take the time to make credible frames (that's what I pose the most problems today), chimneys and skylights and put the canopy, but it's starting to look like something. I obviously made full errors, but the key is to understand them, never to reproduce them.